A wise person once said, “if you fail to plan, you plan to fail.”
Continue readingGiving Thanks
I try to make gratitude a daily practice, but this Thanksgiving, I feel like I have even more to be grateful for than ever.
Continue readingMovin’ on Back
Work in the front and on the side is close to done and things are heating up out back, even if the weather is cooling down. . .
Continue readingOf Laundry Rooms and Landscape Work
Laundry room revelations and ever-evolving hardscape progress
Continue readingMaking Landscape Headway
Well, despite other jobs conflicting with a lot of the guys’ work during the weekdays, whenever they show up, they seriously crank.
Here were some results, a couple of hours into day three:
Then, about five hours later, we were here:
Then came day four:
And on day five, the efforts of just one guy got us here:
Believe it or not, even with all that stone we had delivered, we need more! The order for that is in process, and hopefully, we’ll have delivery by late this week so the guys can keep the momentum going this coming weekend.
Here are a couple from this morning, now that I’ve added some seasonal decorations to the front. We’ll see how long the pumpkins and gourds will last before the squirrels feast on them.
And in the meantime, Tim also attached the finial to the garage cupola:
Updates from Landscaping-Land
Progress is great, and patience is hard when you’re this excited about something.
Continue readingWork(s) in Progress
Some of the action since Friday morning
Mama cupola is up, though we had one little issue. . . The last piece of glass, which goes in the “door” on the left-hand side, became a victim of Friday afternoon’s gusty wind. This shot, if you look really closely, shows Tim inside, installing one of the panes before the wind had the final say:
But, it still looks really pretty, and we’ll get a new piece of glass (plexiglass for this panel, perhaps?) soon:
Now I have to go shopping for a light fixture to put in there, because the neighborhood has voted, informally but unanimously, that it needs to be lit up. Who am I to argue?
While all that was happening, I decided to get a different perspective on the pre-landscaping state-of-affairs, by climbing out the front window and onto the front porch roof:
By yesterday morning (Saturday), the contractor had the machines here and ready to go:
And by early afternoon yesterday, the digging began!!
The guys made great progress in about 5 -6 hours yesterday:
Then there’s the backyard!!
Today they’ll be doing more digging and prep for the patio and walkway areas and the stone walls, plus installing electrical conduit piping so we can finally stop running the garage by plugging it in to a heavy duty extension cord. . .
Happy Sunday everyone!
What’s Been Going On…
Howdy y’all!! Sorry it’s been so long with no updates!
Since early August, we’ve been up to a little bit of a lot of things, including finalizing design details for the landscaping, which, at long last, will be kicking off next week (a not-so-little undertaking!!). The delivery of, quite literally, tons of materials, began today, with 3 truckloads of “Connecticut Blend” pea gravel:
Most of the rest of the stone will arrive tomorrow, except for the stone we’ll be using for the walls in the back, the step for the side door, and a semi-circular “sitting wall” at one end of the side patio. And the bluestone for the top of the sitting wall and the side step. The contractor will be bringing those next week.
After a very long wait, “Mama Cupola” is being installed on the house. Tim set the saddle the other day; today I helped get her midsection into place. Hoping the top will go up, the glass will go in, and the finials for both cupolas will be in their forever homes when the weather clears up tomorrow…
Meanwhile, back on the inside of the house, we bought, and Tim installed, our laundry room sink. I just ordered the stone for that countertop yesterday (I’ll share a photo of that once the countertop is in. It’s kinda boring for now!).
We stained and painted the handrail, newel posts, and the acorn finials for the staircase (cue the choir of angels… those have been fully in place since January, if memory serves, so this was one of my big “let’s just get it done already” items …)
Same goes for the finish painting in the upstairs hall. With that done, the switch plate cover for all the switches at the top of the stairs is back in its proper place (shown in the photo above).
I’m fairly certain no one is happier about that than I am. (It’s been off since the upstairs hallway trim was painted, well-over a year ago. It might even be two years. Clearly, all vestiges of the impatience that was a hallmark of my youth have long-since left the building. Literally).
I’ll be taking lots of photos as the landscaping (really hardscaping for now) happens over the next few weeks. (Planting plans are still TBD and won’t happen until spring).
I promise, barring any unforeseen circumstances, to share the progress as we go, so stay tuned!!